Jump to content
View in the app

A better way to browse. Learn more.

Surly Horns

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Featured Replies

1 hour ago, The Royal We said:

I haven't seen this mentioned here yet, but I'm pretty shocked that Texas' leadership is making a good decision for a change.

image.png.5f404826296bfbfa49d0646b3c92fddf.png

https://electrek.co/2024/10/03/hell-froze-over-in-texas-us-grid-first-time/

Somehow this was done without ERCOT falling under FERC which means Texas connects without those federal regulations. They get the benefit of being connected to the national grid without having to deal with federal oversight.

Edited by F250

  • Replies 2.7k
  • Views 167k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • High Plains Drifter
    High Plains Drifter

    I was driving around just now, listening to NPR, and they called out Abbot for his bullshit. I believe the direct quote was something like "Governor Abbot falsely claimed renewable energy was the caus

  • Hugo Stiglitz
    Hugo Stiglitz

  • Bullneck
    Bullneck

Posted Images

https://www.energy.gov/articles/biden-harris-administration-invests-15-billion-bolster-nations-electricity-grid-and-0

  • Southern Spirit will construct a new 320-mile HVDC line connecting the Electric Reliability Council of Texas (ERCOT) grid for the first time with electric grids in the southeastern U.S. power markets, including Midcontinent Independent System Operator South (MISO-S) and Southern Company (SOCO), which will enhance reliability and prevent outages during extreme weather events, like Winter Storm Uri that hit Texas in 2022. This line across Texas, Louisiana, and Mississippi will provide 3,000 MW of bidirectional capacity and create 850 construction jobs and 305 permanent operations jobs. (up to $360 million potential contract value) 

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.